Select Your Power Solution

Match the technology to your project's scale and economic goals.

Solution Core Primary Output Best For Key Value Proposition
190 Series Generator Set Electricity
(400kW – 1,200kW)
Livestock Farms, Medium WWTPs, Self-Consumption. Low CAPEX & Robustness. High cost-performance for reliable baseload power.
300 Series Generator Set Electricity
(1,500kW – 2,000kW+)
Large Industrial Plants, IPP (Grid Sales). ≥40% Electrical Efficiency. Turbocharged performance for maximum revenue.
Integrated CHP Plant Electricity + Usable Heat Projects with on-site thermal demand. Total System Efficiency >85%. Fastest ROI by utilizing waste heat.
High-Efficiency Methane Upgrading
The Cost-Effective Workhorse

190 Series Generator Sets

Engineered for continuous operation in agricultural and wastewater applications where durability comes first.

  • Power Range: 400kW – 1,200kW
  • Engine Type: Robust V-Configuration
  • Key Benefit: Low CAPEX & Easy Maintenance
  • Control: Woodward Master Control
Conditioning & Delivery
The High-Efficiency Performer

300 Series Generator Sets

Designed for large-scale projects where electrical output and efficiency are paramount for profitability.

  • Power Range: 1,500kW – 2,000kW+
  • Efficiency: ≥40% Electrical Efficiency
  • Deployment: Containerized Plug & Play
  • OPEX: Low Lube Oil Consumption

Technical Specifications at a Glance

Quick reference for our most popular configurations.

Model No. Prime Power (kW)
Electrical Eff. (%) Engine Type Lube Oil Cons. Dimensions (L×W×H)
BW-190-600 600 38.5% V12 < 0.5 g/kWh 4.5m × 1.6m × 2.2m
BW-190-1000 1000 39.0% V16 < 0.5 g/kWh 5.2m × 1.8m × 2.3m
BW-300-1500 1500 40.8% V16 < 0.3 g/kWh 40ft High Cube Container
BW-300-2000 2000 41.5% V20 < 0.3 g/kWh 40ft High Cube Container

Engineered for the Harshest Environments

Why engineers specify Biowatt-Biogas for long-term reliability.

1. Intelligent Control (Woodward)

Full authority air-fuel ratio control ensures automatic grid synchronization, load sharing, and remote SCADA monitoring. Enables unmanned operation.

2. High Availability & Long Life

Designed for continuous baseload operation (>8,000 hrs/yr). Designed for a major overhaul interval of up to 40,000 hours, subject to gas quality and maintenance.

3. Robust Anti-Corrosion

Specialized materials for gas train components handle trace H₂S impurities (< 200ppm tolerance). Stainless steel heat exchangers for longevity.

4. Containerized & Soundproof

Pre-assembled ISO containers with integrated cooling. Noise level < 75dB(A) @ 7m. Slashes onsite installation time by 70%.

Combined Heat & Power (CHP)

Squeeze every joule. Recover waste heat to boost total system efficiency > 85%.

Step 1

Biogas fuels the engine to
Generate Electricity

Step 2

Heat Recovery Unit captures
Exhaust & Jacket Heat

Step 3

Produces Hot Water / Steam for your process

Strategic Benefit: Reduce boiler fuel costs to zero and shorten project ROI by 12-18 months.

Focused primarily on thermal energy (Steam/Hot Water) without power generation? Explore Our Dedicated Biogas Boilers →

Why Engineers Specify Biowatt-Biogas

Skid-Mounted & FAT Certified

Fully assembled and tested before shipping to reduce site risk.

Industrial Automation

Siemens/Woodward PLCs with remote IoT monitoring.

Globally Proven

Operating in 10+ countries in agricultural and industrial plants.

End-to-End Expertise

From digester gas output to final grid injection.

Request Project Assessment

Get a Free Project Assessment & ROI Projection